October 5, 2017

October 4, 2017

October 3, 2017

September 29, 2017

September 28, 2017

September 25, 2017

September 23, 2017

September 22, 2017

Please reload

Recent Posts

Day 1

August 1, 2017

1/1
Please reload

Featured Posts

Day 21

August 21, 2017

Ceiling works have to stop as they need the tiling works to finish before they can come back and cover up everything.

 

Floor is being filled up at the living room area due to the removal of the wall. New reclaimed living room floor has dried and tiling work in progress.

 

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2020 by ALTRO.SG | E: info@altro.sg | M: +65 8112 1202