top of page

Day 3

Demolition work starts today. All the built-in cabinets are removed and disposed.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2025 by ALTRO.SG

bottom of page