top of page

Day 21

  • Nash So
  • Aug 21, 2017
  • 1 min read

Ceiling works have to stop as they need the tiling works to finish before they can come back and cover up everything.

Floor is being filled up at the living room area due to the removal of the wall. New reclaimed living room floor has dried and tiling work in progress.


Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2025 by ALTRO.SG

bottom of page