top of page

Day 25

Tiling works in progress, tiles in master bath done and kitchen wall tiles in progress. After this they will proceed with working on the kitchen floor tiles.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2025 by ALTRO.SG

bottom of page