Day 28

Window grilles are installed for living, bedroom and master bedroom. Kitchen floor is screeded in preparation for floor tiles to be installed. Wall and floor tiles in bath is installed.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2021 by ALTRO.SG | E: info@altro.sg | M: +65 8112 1202