top of page

Day 28

Window grilles are installed for living, bedroom and master bedroom. Kitchen floor is screeded in preparation for floor tiles to be installed. Wall and floor tiles in bath is installed.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2024 by ALTRO.SG

bottom of page