Day 33

Kitchen flooring done, next is doing the concrete base. Major piping works for plumbing and air-con drainage done.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2021 by ALTRO.SG | E: info@altro.sg | M: +65 8112 1202