top of page

Day 33

Sep 3, 2017
1 min read

Kitchen flooring done, next is doing the concrete base. Major piping works for plumbing and air-con drainage done.

  • Living room
  • Living room
  • Kitchen
  • Kitchen
  • Bath
  • Bath
  • Bath
  • Bath
  • Bath
  • Bath
  • Bath
  • Bath
  • Master Bath
  • Master Bath
  • Master Bath
  • Master Bath


Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2026 by ALTRO.SG

bottom of page