top of page

Day 33

  • Nash So
  • Sep 3, 2017
  • 1 min read

Kitchen flooring done, next is doing the concrete base. Major piping works for plumbing and air-con drainage done.


Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2025 by ALTRO.SG

bottom of page