top of page

Day 34

Plumbing works in progress to lay hot and cold water pipes. Kitchen and bath concrete base done.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2024 by ALTRO.SG

bottom of page