top of page
Search

Day 43

  • Nash So
  • Sep 13, 2017
  • 1 min read

As with all HDB flats, most walls are not flat. Due care was taken to plaster the rest of the walls that is exposed to allow the painting works to have a smooth finishing. All ceiling lights are installed and turned on for the first time.


Recent Posts

See All
Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

INTERIOR DESIGN CONSULTANCY

© 2025 by ALTRO.SG

bottom of page