Day 43As with all HDB flats, most walls are not flat. Due care was taken to plaster the rest of the walls that is exposed to allow the painting works to have a smooth finishing. All ceiling lights are installed and turned on for the first time.
As with all HDB flats, most walls are not flat. Due care was taken to plaster the rest of the walls that is exposed to allow the painting works to have a smooth finishing. All ceiling lights are installed and turned on for the first time.