top of page

Day 43

As with all HDB flats, most walls are not flat. Due care was taken to plaster the rest of the walls that is exposed to allow the painting works to have a smooth finishing. All ceiling lights are installed and turned on for the first time.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page